The JAG foot drives have arrived and here I have just fitted the 12v NPC 2212 motor
Fantastic piece of engineering
The foot shells should be ready in a month so then I'll at least be able to get R2 on 2 feet
I also still need to shave the top of the motors down a little so that they can fit neatly inside the battery boxes
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment